This is just sad

Post by Warren Kaplan »

You'd think that naval design and engineering could do better at this stage. Then again, its a government program so what else would we expect. This, in the NY Times this morning. Its long but even if you just read the first few paragraphs you'll get the gist of it. Our Tax Money At Work :oops:






--------------------------------------------------------------------------------

December 9, 2006
Failure to Navigate
Billions Later, Plan to Remake the Coast Guard Fleet Stumbles
By ERIC LIPTON
WASHINGTON, Dec. 8 — Four years after the Coast Guard began an effort to replace nearly its entire fleet of ships, planes and helicopters, the modernization program heralded as a model of government innovation is foundering.

The initial venture — converting rusting 110-foot patrol boats, the workhorses of the Coast Guard, into more versatile 123-foot cutters — has been canceled after hull cracks and engine failures made the first eight boats unseaworthy.

Plans to build a new class of 147-foot ships with an innovative hull have been halted after the design was found to be flawed.

And the first completed new ship — a $564 million behemoth christened last month — has structural weaknesses that some Coast Guard engineers believe may threaten its safety and limit its life span, unless costly repairs are made.

The problems have helped swell the costs of the fleet-building program to a projected $24 billion, from $17 billion, and delayed the arrival of any new ships or aircraft.

That has compromised the Coast Guard’s ability to fulfill its mission, which greatly expanded after the 2001 attacks to include guarding the nation’s shores against terrorists. The service has been forced to cut back on patrols and, at times, ignore tips from other federal agencies about drug smugglers. The difficulties will only grow more acute in the next few years as old boats fail and replacements are not ready.

Adm. Thad W. Allen, who took over as Coast Guard commandant in May, acknowledged that the program had been troubled and said that he had begun to address the problems. “You will see changes shortly in the Coast Guard in our acquisition organization,” Admiral Allen said. “It will be significantly different than we have done in the past.”

The modernization effort was a bold experiment, called Deepwater, to build the equivalent of a modest navy — 91 new ships, 124 small boats, 195 new or rebuilt helicopters and planes and 49 unmanned aerial vehicles.

Instead of doing it piecemeal, the Coast Guard decided to package everything, in hopes that the fleet would be better integrated and its multibillion price would command attention from a Congress and White House traditionally more focused on other military branches. And instead of managing the project itself, the Coast Guard hired Lockheed Martin and Northrop Grumman, two of the nation’s largest military contractors, to plan, supervise and deliver the new vessels and helicopters.

Many retired Coast Guard officials, former company executives and government auditors fault that privatization model, saying it allowed the contractors at times to put their interests ahead of the Guard’s.

“This is the fleecing of America,” said Anthony D’Armiento, a systems engineer who has worked for Northrop and the Coast Guard on the project. “It is the worst contract arrangement I’ve seen in all my 20 plus years in naval engineering.”

Insufficient oversight by the Coast Guard resulted in the service buying some equipment it did not want and ignoring repeated warnings from its own engineers that the boats and ships were poorly designed and perhaps unsafe, the agency acknowledged. The Deepwater program’s few Congressional skeptics were outmatched by lawmakers who became enthusiastic supporters, mobilized by an aggressive lobbying campaign financed by Lockheed and Northrop.

And the contractors failed to fulfill their obligation to make sure the government got the best price, frequently steering work to their subsidiaries or business partners instead of competitors, according to government auditors and people affiliated with the program.

Even some of the smaller Deepwater projects raise questions about management. The radios placed in small, open boats were not waterproof and immediately shorted out, for example. Electronics equipment costing millions of dollars is still being installed in the new cutter, even though it will be ripped out because the Coast Guard does not want it. An order of eight small, inflatable boats cost an extra half-million dollars because the purchase passed through four layers of contractors.

For the Department of Homeland Security, which took over responsibility for the Coast Guard in 2003, Deepwater joins its already long list of troubled programs, including its airport checkpoint measures, its biodefense efforts and its widely condemned handling of the response to Hurricane Katrina.

The Homeland Security Department’s inspector general has warned that the department cannot repeat this experience as it begins a $7 billion plan to tighten the border. The department is taking a similar management approach with that plan, relying on the Boeing Corporation to develop, supervise and execute the strategy.

Spokesmen for Northrop and Lockheed, and the partnership they formed to run Deepwater, declined repeated requests for interviews, saying they would leave it to the Coast Guard to discuss the project. The companies also declined to respond to written questions.

Admiral Allen said the Coast Guard engineers and procurement staff team would now play a much larger role in overseeing the project in an effort to rein in its private sector partners, adding that the mistakes made were unacceptable.

“Our people are demoralized by it, they don’t deserve it, and it really impedes our ability to execute our mission,” he said.

Early Warnings

On a clear, calm morning in Key West, Fla., one day last month — perfect weather for running drugs and migrants — six of the eight converted Coast Guard patrol boats were broken down or out of service. Their crews had little to do but shine the ships’ already gleaming bells and clean its guns.

The Deepwater plan called for transforming the 110-foot boats into larger, more versatile cutters with rebuilt hulls, new communications and surveillance gear and a 13-foot extension to make room for a small boat launch ramp.

Even before the refurbishing began in 2003, though, Coast Guard engineers expressed doubts that the boats could bear the extra weight the changes would impose. “You could have buckling of the structure of the ship,” Chris Cleary, of the Engineering Logistics Center at the Coast Guard, said he recalls pointing out. But Bollinger Shipyards, a business partner of Northrop and Lockheed, insisted the conversion would succeed.

As the work got under way, the Coast Guard provided only limited oversight. It did not fill dozens of its seats on joint management teams set up for the project. And the Coast Guard assigned seven inspectors to monitor the work, compared with 20 on a similar-size job.

“In theory, we were going drive a 110-foot cutter up to the pier, drop it off and come back in 34 weeks to pick up a 123-foot cutter,” said Lt. Benjamin Fleming, the Coast Guard’s representative at the shipyard in Lockport, La. “We were putting a lot of trust and faith in our partners.”

Michael De Kort, a former Lockheed project manager, said the results quickly became apparent.

The VHF radio on the small launch would be exposed to the elements but was not waterproof, Mr. De Kort said. The classified communications equipment had not been properly shielded to protect messages from eavesdropping. Cameras intended to provide 360-degree surveillance had two large blind spots.

Mr. De Kort said he had repeatedly warned his Lockheed supervisors of the problems, but was rebuffed. “We have an approved design and we aren’t going to change it,” Mr. De Kort said he was told. He was later laid off from the company. Lockheed officials declined to comment.

In September 2004, more serious flaws in the boat conversion program became obvious after the first one, the Matagorda, was launched. As it traveled in relatively heavy seas from Key West to Miami, large cracks appeared in the hull and deck.

Giant steel straps that looked like Band-Aids were affixed to the side of the boats, and the vessels were barred from venturing out in rough water. But cracks and bulges continued to scar the Matagorda and other converted ships, followed by a series of mechanical problems.

Bollinger, it turned out, had overestimated how much stress the modified boats could handle, a miscalculation it cannot fully explain. “The computer broke for some reason,” said T. R. Hamlin, a senior Bollinger manager. “Whether it was a power surge or something, who knows?” The cursory oversight by the Coast Guard meant the mistake was not caught in time.

After spending about $100 million on the first eight boats, the Coast Guard suspended the conversion plan. Last week, Admiral Allen ordered the boats taken out of service, citing concerns about crew safety.

Facing a shortage of patrol boats, the contractors and the Coast Guard decided to speed development of a larger ship, the Fast Response Cutter. The hull was to be built from glass-reinforced plastic, known as a composite, something never tried on a large American military ship.

While acknowledging that it might cost much more to build the 58 planned cutters with composite hulls instead of steel, Northrop and Lockheed claimed the boats would last longer and require less maintenance, saving money over the long run.

Coast Guard engineers again were doubtful that Northrop’s design would work, citing concerns about weight, hull shape and fuel consumption. The Coast Guard also found inconsistencies in the cost data Northrop used to justify the new hull.

One former Northrop executive said the company was pushing the plan not because it was in the best interest of the Coast Guard, but because Northrop had just spent $64 million to turn its shipyard in Gulfport, Miss., into the country’s first large-scale composite hull manufacturing plant for military ships.

“It was a pure business decision,” said the former executive, who disagreed with the plan and would speak only anonymously for fear of retribution. “And it was the wrong one.”

That became clear when a scale model of the Fast Response Cutter was placed in a tank of water — and flunked the test. After three years and $38 million, Northrop Grumman’s plan was suspended.

Financial Aid

The Coast Guard recognized from the start that it might need help financing a project as big as Deepwater, and that was part of the reason it turned to Lockheed and Northrop.

“They have armies of lobbyists, they can help get dollars to get the job done,” explained Jim McEntire, a retired captain who had served as a senior Coast Guard budget official. “The White House and Congress listen to big industrial concerns.”

That assistance would prove valuable. Just months after the contract was awarded in June 2002 through a competitive bidding process, the Coast Guard began to study whether the $17 billion Deepwater budget would be inadequate, given additional costs for antiterrorism equipment. In 2005, the service informed Congress that the program would cost $24 billion over 20 years and that the annual allocation would need to double, to $1 billion.

By then, though, the patrol boat conversion had been halted. Deepwater’s costs were ballooning, but the Coast Guard was having a hard time explaining exactly how it would spend more money. Government auditors were starting to churn out reports warning of serious management weaknesses.

That record disturbed some members of Congress. In May 2005, the House Appropriations Committee slashed the program’s annual budget request nearly in half to register its frustration.

At a hearing two months later, Representative Harold Rogers, a Kentucky Republican who oversees the Homeland Security budget, instructed the Coast Guard to fix its problems and restrain costs. “You simply took the most expensive, all-inclusive Cadillac Seville and we’re going to have to, with our limited funds, fit you into something a bit more appropriate,” Mr. Rogers said. “I hope it’s more than a Chevrolet.”

To fight back, the Coast Guard and contractors relied on Congressional allies, led by Senator Olympia J. Snowe, Republican of Maine, Representative Frank A. LoBiondo, Republican of New Jersey, and Representative Gene Taylor, Democrat of Mississippi.

Mr. Taylor and Mr. LoBiondo had formed a group called the Congressional Coast Guard Caucus. It began in the late 1990s with 4 members and today has more than 75.

The enthusiasm of the three leaders for the Deepwater project was not simply about meeting the Coast Guard’s needs. Maine is home to Bath Iron Works, a major ship builder that Ms. Snowe said might benefit from increased Deepwater spending. While that was a factor, she said it was not her primary motivation.

Ms. Snowe and Mr. LoBiondo, the leaders of the Senate and House panels that oversee the Coast Guard, said they pushed for more spending only after the service’s leaders reassured them during hearings that they were addressing the program’s problems. They both also said they were convinced that the Coast Guard desperately needed Deepwater because its helicopter engines were routinely breaking down and the hulls of old ships were failing.

“We don’t want to waste money; we don’t want ineffective programs,” Ms. Snowe said in an interview. “At the same time, we can’t allow the Coast Guard to languish.”

Mr. Taylor’s district is home to Northrop Grumman’s shipyard in Pascagoula, Miss., which is building the Coast Guard’s largest ship, and Northrop and its employees are one of his biggest sources of campaign contributions. He worked along with two key Republicans in Mississippi — Senator Trent Lott, whose father was once a pipe fitter at the Pascagoula shipyard, and Senator Thad Cochran, the chairman of the Senate appropriations committee — to win more money.

Mr. LoBiondo’s district is home to the Coast Guard’s national training center, and Lockheed Martin built its Deepwater equipment testing center just outside his district. He is also one of the top Congressional recipients of Lockheed contributions.

The contractors ran advertisements aimed at lawmakers in Washington publications, delivering ominous messages about the need to stop terrorists before they reach American shores. The Navy League, a nonprofit group partly financed by Lockheed and Northrop, orchestrated telephone calls, letters and visits to lawmakers, reminding them that hundreds of contractors across the country were already working as suppliers on the project.

And the Coast Guard got an important boost when it was widely praised for its helicopter rescues after Hurricane Katrina.

The lobbying effort paid off. In September 2005, Congress agreed to increase the annual financing for Deepwater to nearly $1 billion.

Late Scramble

If there was a single ship that could prove to skeptics that the Coast Guard and its contractors could get the job done right, it would be the National Security Cutter, a ship unlike anything the Coast Guard had ever built. Bigger than any existing cutter, it was more like a warship, designed to patrol with Navy vessels.

It would carry sophisticated weapons systems, surveillance equipment, a helicopter and two unmanned aerial vehicles, all vital in its effort to intercept boats suspected of carrying terrorists, drug dealers or illegal immigrants. It was designed to monitor 56,000 square miles a day, an area four times as large as that covered by any other Coast Guard ship.

Because the ship was so expensive — each was expected to cost about $300 million — the Coast Guard decided to build only 8 to replace its fleet of 12 large cutters.

There was just one catch. Even before the cutter began taking form at the Pascagoula shipyard on the Gulf of Mexico, familiar problems cropped up.

The Coast Guard’s engineers believed the design proposed by Northrop and Lockheed had serious structural flaws that could result in the hull collapsing or premature cracking of the hull and deck, according to Mr. Cleary and his boss, Rubin Sheinberg, chief of the Coast Guard’s naval architecture branch.

When they alerted the contractors and Coast Guard officials, they were largely brushed off, the men said. In March 2004, their supervisor protested, saying the Coast Guard should delay construction.

“Significant problems persist with the structural design,” Rear Adm. Erroll M. Brown wrote to the Deepwater project director. “Several of these problems compromise the safety and the viability of the hull, possibly resulting in structural failure and unacceptable hull vibration.”

The Coast Guard decided to move ahead anyway, figuring it would be less disruptive to fix any problems later. As the shipbuilding progressed, other Coast Guard officials began to openly complain that some decisions by the contractors appeared to be motivated by a drive to increase profits, not to best serve the Coast Guard.

Lockheed, for example, ordered computerized consoles for the ship that it had developed for a Navy aircraft carrier. But they were too big for the cutter, said Jay A. Creech, a retired Coast Guard captain working as a contractor on Deepwater.

A consultant hired by the Coast Guard to review Northrop and Lockheed’s purchasing decisions found that of $210 million worth of contracts awarded in 2004, just 30 percent involved a formal competitive process. Northrop in particular was faulted for failing to aggressively seek bids to ensure the best price.

Northrop and Lockheed “lack the independence needed to make objective decisions in the best interests of the Coast Guard,” an August 2006 report by the Homeland Security inspector general said.

Others say that giving the contractors so much authority was a mistake from the start. “A contractor with a profit motive is never a trusted agent,” said Joe Ryan, a Coast Guard consultant who has helped with the Deepwater project. “They are the vendor, and they are selling you something.”

Problems began to accumulate elsewhere. In Texas, a prototype of the unmanned aerial vehicle that was to be placed on the ship’s deck crashed this year. After the crash, the project, by Bell Helicopter, also faced a money crunch and was put on hold, pushing delivery back to at least 2013, six years after the first national security cutter is scheduled for active duty. Without the two aerial vehicles, the cutter’s surveillance range is reduced by more than half.

By the time the ship was christened last month, its price had grown to $564 million, nearly twice its original cost. (The average price for the eight ships is expected to be $431 million.) And by then, Coast Guard officials had conceded that the ship had structural flaws. Navy experts had evaluated the ship and confirmed many of the earlier warnings.

Admiral Allen said he had been given assurances that the ship was not at risk of a catastrophic hull failure and would not pose a safety threat to its crew. But the Coast Guard has decided to make structural modifications to the vessel and require design changes for the third cutter. Work is too far along to change course on the second cutter.

Four years into the Deepwater project, the Coast Guard, according to its original plan, was supposed to have 26 new or rebuilt ships, 12 new planes and 8 unmanned vehicles, but none are available. Now, officials are scrambling to find an off-the-shelf design for a new cutter and make modest repairs to keep their aging patrol boats operable.

“We don’t have the ships we need, and we don’t have a way to get them anytime soon,” said Representative David R. Obey, Democrat of Wisconsin, who will take over the House Appropriations Committee next month. “It’s inexcusable.”

The Coast Guard, which would not disclose the management fees it has paid Northrop and Lockheed, is renegotiating the contract to ensure that the companies honor a commitment to open the work to competition and deliver what they promise.

And Admiral Allen and other Coast Guard officials say the Coast Guard’s engineers are being given more power to supervise the work. Admiral Allen is also creating a division to oversee the procurement and maintenance of its ships and airplanes. “That is the main gap that needs to be closed,” he said.

The Deepwater experiment, one contracting expert said, underscores the need for the Coast Guard to be a smart buyer, even if it has hired high-priced advice.

“The government still needs to be in there so they know what decisions are being made and if the decisions are in their best interest,” said Michele Mackin, an assistant director at the Government Accountability Office. “It is still their money. And they are going to be flying the planes and running the ships.”



Home
World U.S. N.Y. / Region Business Technology Science Health Sports Opinion Arts Style Travel Jobs Real Estate Automobiles Back to Top
Copyright 2006 The New York Times Company
Privacy Policy Search Corrections RSS First Look Help Contact Us Work for Us Site Map
[/i]
"I desire no more delight, than to be under sail and gone tonight."
(W. Shakespeare, Merchant of Venice)
Dick Barthel
Posts: 901
Joined: Feb 5th, '05, 10:29
Location: Dream Weaver, CD25D, Noank, CT

Political discussion

Post by Dick Barthel »

Warren,

Your "heads up" post has all the ingredients for a good political debate since contracting out is at the heart of the problem. The post is very germane to us because it concerns our Coast Guard which is near (hopefully) and dear to all of us when we're doing our thing.

Thanks for sharing the news.

Dick
Ron M.
Posts: 1037
Joined: Feb 5th, '05, 11:32
Location: CD30c Harwich,Ma.

At least they are consistant

Post by Ron M. »

I just read that story this morning. How do they continue to muck things up ? I want a government job.
________
BUY SILVER SURFER
Last edited by Ron M. on Feb 11th, '11, 05:33, edited 1 time in total.
User avatar
s.v. LaVida
Posts: 310
Joined: Feb 9th, '05, 07:10
Location: LaVida is a Cape Dory 33, Hull#40 Homeport of Olcott,NY

Just Horrible

Post by s.v. LaVida »

Its horrible to think American companies are out to make a huge buck on the backs of our national security.

If a company had done this during WWII, they would have been blacklisted and their officers put on trial.

Northrop and Lockheed should be ashamed and their officers put on public trial for their greed!

Better yet, send them to Iraq to serve with our boys and get a real feel of what supporting a global war is all about!

Rit
Neil Gordon
Posts: 4367
Joined: Feb 5th, '05, 17:25
Location: s/v LIQUIDITY, CD28. We sail from Marina Bay on Boston Harbor. Try us on channel 9.
Contact:

Post by Neil Gordon »

I saw the article this morning.

We ask the kids on the cutters to go out when no sane person would otherwise do so. If they can't have 100% confidence in their ships, they can't do their jobs. (If we don't hold the greed mongers who do these things accountable, we're not doing our jobs.)
Fair winds, Neil

s/v LIQUIDITY
Cape Dory 28 #167
Boston, MA

CDSOA member #698
User avatar
Lee Kaufman
Posts: 95
Joined: Apr 22nd, '05, 12:31
Location: CD25 #12 "Morning Star"

Re: At least they are consistant

Post by Lee Kaufman »

Ron Musk wrote:I want a government job.
Believe me, you don't. I've been there.
jambalaya
Posts: 65
Joined: Mar 8th, '05, 11:07
Location: Cape Dory 30B. Jambalaya. Ruskin, FL.

fraud, waste & abuse

Post by jambalaya »

Just remember that anything you read in the New York Times must be taken with a grain of salt. The one thing you can be sure of is that they are not telling the whole story. They print the facts that support the "story line."
I don't know about this particular matter but I do have a great deal of experience litigating contract issues between defense contractors and the goverment. One recurring issue, particularly in the Naval ship area, is that the government keeps changing the design of the ships during production, which really increases costs.
Moreover, govenment specs are unlike anything you have seen. you can't buy a simple item like a cabinet from Sears. You have to vendor it out to another contractor who must tool up for the item because it is never "standard." And then, only a couple of dozen are needed after the vendor tools up, which further runs the unit cost up.
I'm not suggesting that all contractors are model managers, but its tough to stay in budget when your customer is the government.
My experience is that the government never has enough money in budget to buy what it "really" wants, so they spec out a lesser job and then try to get the contractor to build what it "really" wants without a price increase. That'swhen they would come to see me.
As for "greedy"contractors, most major defense contractors earn a profit of between 6% and 10%. Ask your investment counselor if he would advise you to invest in a company with no better rate of return than that.
Will
Jambalaya
Will Parker
Dick Barthel
Posts: 901
Joined: Feb 5th, '05, 10:29
Location: Dream Weaver, CD25D, Noank, CT

I think I predicted a political discussion

Post by Dick Barthel »

Will,

A lot of people would disagree with your comments on the NY Times, say half the country.

As for government contract litigation, of course its quite common and from what I've seen can go either way depending on the facts. Given the complexity and length of contracts, type of contract (fixed-price, cost-plus), etc., that is really not surprizing.

Not trying to provoke, just suggest there might be another view. There are certainly many documented examples of fraud, waste, etc. by companies like Lockheed, Boeing, Halliburton, etc. Other times I think they might just be good old fashion contract disputes that are obviously common in completely commerical transactions as well.

Just my opinion.

Dick
User avatar
Joe Myerson
Posts: 2216
Joined: Feb 6th, '05, 11:22
Location: s/v Creme Brulee, CD 25D, Hull #80, Squeteague Harbor, MA

Don't shoot the messenger

Post by Joe Myerson »

I'm trying hard not to turn this into a political thread, but I should point out that the story first appeared yesterday in other news media.

Today's story in the NYTimes expanded on the details, but that newspaper wasn't the first to break the story.

Let's not blame the messenger, since the fault lies elsewhere. The point I'm sure we can all agree on is that those courageous young people volunteer to brave the most horrendous maritime conditions imaginable--and they deserve better than this. As do those kids risking their lives in Iraq without sufficient body armor or adequate plating on their Humvees . . . as do those whose tax dollars pay for all of this.

Here's the disclaimer: Of course, that's just my opinion.

--Joe
Former Commodore, CDSOA
Former Captain, Northeast Fleet
S/V Crème Brûlée, CD 25D, Hull # 80

"What a greate matter it is to saile a shyppe or goe to sea."
--Capt. John Smith, 1627
User avatar
tartansailor
Posts: 1530
Joined: Aug 30th, '05, 13:55
Location: CD25, Renaissance, Milton, DE

Heads Need To Roll

Post by tartansailor »

Why in Heavens name were so many ships committed AND built without building 1and testing that to completion before committing to build so many more??

Why was the Navy not consulted? After all the Navy has the breadth and scope to build even much bigger ships.

If ever there was crass incompetence this is a prime example. There needs to be a complete house cleaning, especially some flag grade guys.

Dick
Viam Inveniam Aut Faciam
User avatar
nlmasopust
Posts: 4
Joined: Dec 2nd, '06, 23:24
Location: Laser...
Possibly a CD soon. I hope.
Andover, CT
Contact:

The whole thing was ridiculous

Post by nlmasopust »

I was active duty CG when Deepwater was started. We laughed at the plan even before they started. It was far too ambitious.

I've worked on many of the 110' cutters they speak of as an Electronics Technician. Many of those boats were almost 20 years old going into this refit. I was in the caribbean and the boats down there really took a beating. Those 110's would come back after every patrol needing all kinds of repairs. All the crewmembers I talked to said it was ridiculous to try and add 13' to them.

There you have it. Capitalism definitely doesn't always work. It does for many things, and I'm a libertarian in favor of laissez faire economics... but for the military, not a chance.

I must say it is sorely disappointing as a prior service member to read this article. I always felt that the CG was far less wasteful than other DOD branches. I guess even the CG has fallen to ridiculously wasteful management. So much for Semper Paratus.

~Nate
User avatar
Didereaux
Posts: 492
Joined: Feb 6th, '05, 11:29
Location: last owner of CD-25 #183 "Spring Gail"

I wouldn't put all the...

Post by Didereaux »

I wouldn't put all the blame at the CG level. Remember that the USCG is now a sub agency of that stellar Department of Homeland Security... you know the bosses of FEMA! the TSA!

Homeland Security stands out for its levels of ineptness, incompetence and corruption even in a Washington DC and a Whitehouse who themselves are digging new lows daily.

We need such as the USCG and we need it back as the OLD USCG, not the drug enforcing world trotting extension of the DEA, and not as the extension of the USN...we need the icebreakers, the buoy layers, the light tenders, the smuggler catchers, but most of all we need the life-savers.

The solution is to get the USCG guard out of Homeland Security, maybe back into Treasury, maybe even alone, but get it OUT of the hands of this group that are in power today.
Didereaux- San Leon, TX
last owner of CD-25 #183 "Spring Gail"
"I do not attempt to make leopards change their spots...after I have skinned them, they are free to grow 'em back or not, as they see fit!" Didereaux 2007
Dick Barthel
Posts: 901
Joined: Feb 5th, '05, 10:29
Location: Dream Weaver, CD25D, Noank, CT

Follow up

Post by Dick Barthel »

Agreeing with Dider's points (he's a Texan and should be applauded for his objectivity), our President's words still ring in my ears: "Good job Brownie!"

Having worked for the Federal Government, I think any agency has a hard time juggling multiple priorities when new priorities are added and pushed, especially when the new priorities have political origins. The pre 9-11 FBI was focusing almost exclusively on drug enforcement as I recall and the warnings from field level people about pilot training by persons of Middle Eastern descent did not get pushed up the line because of that myopia.

In fairness, it does seem logical that the Coast Guard should be heavily involved in any overall national defense strategy. They also have so many other responsibilities and should be given the best funding possible to cope. But I would worry that the Coast Guard will also be facing budget cuts in the future to help balance the burgeoning deficit.

Another interesting aside that many people do not realize is that when a defense contractor does research for the government through fixed price contracts they also now routinely can claim the research tax credit even though the government is funding the that research effort. More of the bennies that get passed along to the defense industry under the radar and should be counted in the net profit associated with any single contract.

This is a interesting winter thread you've started Warren and I for one am enjoying the opinions of the good people of our board.

Dick
Neil Gordon
Posts: 4367
Joined: Feb 5th, '05, 17:25
Location: s/v LIQUIDITY, CD28. We sail from Marina Bay on Boston Harbor. Try us on channel 9.
Contact:

Re: Follow up

Post by Neil Gordon »

Dick Barthel wrote:This is a interesting winter thread you've started ...
I prefer to call it "pre-spring."
Fair winds, Neil

s/v LIQUIDITY
Cape Dory 28 #167
Boston, MA

CDSOA member #698
bill2
Posts: 250
Joined: Feb 28th, '06, 17:22
Location: cd - wip
Contact:

responsibility

Post by bill2 »

Yes - definitely a good read with many insights.

I particularly like sv LaVida's comment about warranting blacklisting had this happened during WWII - well why is it any less appropriate now - they are "stealing" our tax dollars .

and as to managing govt projects - well once the design is done no more changes - the contractors can be brought in under budget and ahead of time if you don't continue fiddling with the objectives whilst their trying to hit them .

As the disclaimer goes - IMHO
Post Reply