We recently took delivery on a 1977 CD25. Unfortunately, the head is NOT able to be pumped out, only dumped. How can we adjust or convert? Otherwise, it is a long day!! hessk@war.wyeth.com
hessk@war.wyeth.com
Head on '77 CD25
Moderator: Jim Walsh
Re: Head on '77 CD25
Kay,
It should be relatively simple to install a "Y" valve in your pumpout line, lead a hose to a deck fitting for "Sewage" and viola! you will be able to be pumped out. Check the owners manual for plumbing setup, I know that the manual shows the setup for the CD-30. All in all though, it should be quite easy to do.
Dave Stump
Captain Commanding
s/v Hanalei (CD-30)
It should be relatively simple to install a "Y" valve in your pumpout line, lead a hose to a deck fitting for "Sewage" and viola! you will be able to be pumped out. Check the owners manual for plumbing setup, I know that the manual shows the setup for the CD-30. All in all though, it should be quite easy to do.
Dave Stump
Captain Commanding
s/v Hanalei (CD-30)
Re: Head on '77 CD25
We just finished upgrading this system on our 75 CD25. The problem is finding adequate space for the plumbing.Kay Hess wrote: We recently took delivery on a 1977 CD25. Unfortunately, the head is NOT able to be pumped out, only dumped. How can we adjust or convert? Otherwise, it is a long day!! hessk@war.wyeth.com
If you wish more info, e-mail me.
Jim
jtstull@icubed.com